E-mail us 

Pug Mill Specification Sheet

Please complete this specification sheet with your product and application requirements and e-mail it to us.


Company Name:
Contact Name:
E-mail:
Address:
 
City, State/Province:
Zip/Postal Code:
Phone Number:
Fax Number:
Project/Reference:
Date:
Product/Application:
GENERAL: Jacketed
THROUGHPUT: of Density
MATERIAL CHARACTERISTICS: Please describe; free flowing etc.

  Materials:  Body Jacket Supports

  Jacket (if none) -> TROUGH
    Design Conditions:   Pressure
Temperature
    Operating Conditions:   Pressure Temperature
  Jacket Type:
INSULATION:
  If Required, by; Note: Patterson recommends that insulation if required, is applied after the equipment has been installed started-up and commissioned.
  If by Patterson; Type: Thickness;
  Sheathing; If Sheathing; Type: Thickness;
TROUGH:
  Spray Pipe
Discharge Flange Size or Full Trough Width x Length
  Clearance Under Flange
  Finish:  Internal  with welds
              External with welds
COVER: please specify details
STIRRER SHAFT(S):
SHAFT SEALS: Packing Material Purged
DRIVE: Type
ELECTRICAL:
  Motor Voltage If Other Specify: Phase: Cycles: Enclosure:
  If Other Specify:
  Area Classification: Class Group Division
  Duty:
PAINTING:
   Paint Specification; If Yes Please Forward
PROJECT STATUS DETAILS
Do you require budget price?    or firm price?
Is this for future acquisition?   or immediate purchase?
Has capital expenditure been applied for? or already approved?
When approximately do you expect to purchase? weeks months
What delivery schedule do you anticipate? weeks months

 

 

ADDITIONAL DATA/REMARKS
 

 

 

 

  •      Print out form for your own records.

  •      To transmit e-mail click "Submit"